• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Leadership and Management in Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Leadership and Management in Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    The Process Is the Product: Collaborative Design in Four Silicon Valley Schools

    Thumbnail
    View/Open
    %28asce%291532-6748%282008%298%3A4%28200%29.pdf (230.2Kb)
    Date
    2008
    Author
    Karen Lee Hansen
    Metadata
    Show full item record
    Abstract
    In 1995 the city of Palo Alto passed a $143 million bond initiative to upgrade sixteen elementary and secondary schools. At that time this was the largest school bond ever passed by a California municipality. I outline the process used to arrive at the final design (contract documents) phase of four elementary schools. I also address the trend toward greater collaboration between design professionals and stakeholders.
    URI
    http://yetl.yabesh.ir/yetl/handle/yetl/55472
    Collections
    • Leadership and Management in Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse
    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV