| dc.contributor.author | Nita Ing | |
| dc.date.accessioned | 2017-05-08T21:32:12Z | |
| dc.date.available | 2017-05-08T21:32:12Z | |
| dc.date.copyright | July 2001 | |
| dc.date.issued | 2001 | |
| dc.identifier.other | %28asce%291532-6748%282001%291%3A3%2833%29.pdf | |
| dc.identifier.uri | http://yetl.yabesh.ir/yetl/handle/yetl/55259 | |
| dc.description.abstract | In this speech, delivered in September 2000 in Taipei, Taiwan, at the 17th International Symposium on Automation and Robotics in Construction, the chairman of the Taiwan High-Speed Rail Corporation summarizes her experiences in working with the private sector on a build/operate/transfer rail project. She discusses cooperation between government and the private sector, project financing, procurement methods, and risk allocation. The way in which the build/operate/transfer mechanism can stimulate the development of a sector in a country and raise the level of expertise is described. | |
| dc.publisher | American Society of Civil Engineers | |
| dc.title | The Implementation Of the Taiwan High-Speed Rail Project as A Private-Sector Venture: Opportunity And Challenges | |
| dc.type | Journal Paper | |
| dc.journal.volume | 1 | |
| dc.journal.issue | 3 | |
| dc.journal.title | Leadership and Management in Engineering | |
| dc.identifier.doi | 10.1061/(ASCE)1532-6748(2001)1:3(33) | |
| dc.tree | Leadership and Management in Engineering:;2001:;Volume ( 001 ):;issue: 003 | |
| dc.contenttype | Fulltext | |