• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Leadership and Management in Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Leadership and Management in Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    The Implementation Of the Taiwan High-Speed Rail Project as A Private-Sector Venture: Opportunity And Challenges

    Thumbnail
    View/Open
    %28asce%291532-6748%282001%291%3A3%2833%29.pdf (92.84Kb)
    Date
    2001
    Author
    Nita Ing
    Metadata
    Show full item record
    Abstract
    In this speech, delivered in September 2000 in Taipei, Taiwan, at the 17th International Symposium on Automation and Robotics in Construction, the chairman of the Taiwan High-Speed Rail Corporation summarizes her experiences in working with the private sector on a build/operate/transfer rail project. She discusses cooperation between government and the private sector, project financing, procurement methods, and risk allocation. The way in which the build/operate/transfer mechanism can stimulate the development of a sector in a country and raise the level of expertise is described.
    URI
    http://yetl.yabesh.ir/yetl/handle/yetl/55259
    Collections
    • Leadership and Management in Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV