• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Practice Periodical of Hazardous, Toxic, and Radioactive Waste Management
    • View Item
    •   DSpace Home
    • ASCE
    • Practice Periodical of Hazardous, Toxic, and Radioactive Waste Management
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Emerging Ideas: Site-Specific Benefit-Cost Analysis for Environmental Remediation Projects

    Thumbnail
    View/Open
    %28asce%291090-025x%281997%291%3A2%2847%29.pdf (377.4Kb)
    Date
    1997
    Author
    Kevin K. Wolka
    Metadata
    Show full item record
    Abstract
    A proposed site-specific benefit-cost analysis methodology for use in remedy selection for environmental remediation projects is analyzed. Benefits, costs, and benefit-cost analysis are defined in the context of environmental remediation. Difficulties in determining and maximizing the benefit-cost ratio are addressed. A case study of a manufacturing facility contaminated with volatile organic compounds is presented with the actual results using the current feasibility study method for remedy selection. A comparison of these results with the results of a site-specific benefit-cost analysis is made. The comparison shows a similar selected remedy, ground-water monitoring with institutional controls, for both analysis methods.
    URI
    http://yetl.yabesh.ir/yetl/handle/yetl/53525
    Collections
    • Practice Periodical of Hazardous, Toxic, and Radioactive Waste Management

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV