dc.description.abstractIt is not inconceivable that everything except the basic structure of an office building could be prefabricated in the near future. Quality and schedule are nearly always improved with prefabrication due to the simple change from an uncontrolled work environment to a controlled one. One Ludgate Place, is a 23,600 m
dc.publisherAmerican Society of Civil Engineers
dc.titleManagement of Prefabrication for Complex Cladding: Case Study
dc.typeJournal Paper
dc.journal.volume3
dc.journal.issue2
dc.journal.titleJournal of Architectural Engineering
dc.identifier.doi10.1061/(ASCE)1076-0431(1997)3:2(60)
dc.treeJournal of Architectural Engineering:;1997:;Volume ( 003 ):;issue: 002
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record