Management of Prefabrication for Complex Cladding: Case Study
Abstract
It is not inconceivable that everything except the basic structure of an office building could be prefabricated in the near future. Quality and schedule are nearly always improved with prefabrication due to the simple change from an uncontrolled work environment to a controlled one. One Ludgate Place, is a 23,600 m