| dc.contributor.author | Lee, Jung Hyun | |
| dc.contributor.author | Seok, Changmin | |
| dc.contributor.author | Hamilton, Parker | |
| dc.contributor.author | Kingsley, Gordon | |
| dc.contributor.author | Ashuri, Baabak | |
| dc.date.accessioned | 2026-08-20T11:14:34Z | |
| dc.date.available | 2026-08-20T11:14:34Z | |
| dc.date.copyright | 2025/09/23 | |
| dc.date.issued | 2026 | |
| dc.identifier.other | JLADAH.LADR-1381.pdf | |
| dc.identifier.uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4311902 | |
| dc.description.abstract | AbstractIn design–build (DB) projects, the design–builder is engaged before the design is
fully completed, embedding unknown factors, such as subsurface conditions and design
commitments, into the project. Given the limited time available for procurement, ... | |
| dc.publisher | American Society of Civil Engineers | |
| dc.title | Strategies for Effective Scope Validation during Pre- and Postaward Phases in Design–Build Infrastructure Projects | |
| dc.type | Journal Article | |
| dc.journal.volume | 18 | |
| dc.journal.issue | 1 | |
| dc.journal.title | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction | |
| dc.identifier.doi | 10.1061/JLADAH.LADR-1381 | |
| dc.journal.fristpage | 04525074-1 | |
| dc.journal.lastpage | 04525074-12 | |
| dc.page | 12 | |
| dc.tree | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2026:;Volume ( 018 ):;issue: 001 | |
| dc.contenttype | Fulltext | |