dc.description.abstractAbstractIn design–build (DB) projects, the design–builder is engaged before the design is fully completed, embedding unknown factors, such as subsurface conditions and design commitments, into the project. Given the limited time available for procurement, ...
dc.publisherAmerican Society of Civil Engineers
dc.titleStrategies for Effective Scope Validation during Pre- and Postaward Phases in Design–Build Infrastructure Projects
dc.typeJournal Article
dc.journal.volume18
dc.journal.issue1
dc.journal.titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
dc.identifier.doi10.1061/JLADAH.LADR-1381
dc.journal.fristpage04525074-1
dc.journal.lastpage04525074-12
dc.page12
dc.treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2026:;Volume ( 018 ):;issue: 001
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record