    Strategies for Effective Scope Validation during Pre- and Postaward Phases in Design–Build Infrastructure Projects

    Thumbnail
    View/Open
    JLADAH.LADR-1381.pdf (1.333Mb)
    Date
    2026
    Author
    Lee, Jung Hyun
    Seok, Changmin
    Hamilton, Parker
    Kingsley, Gordon
    Ashuri, Baabak
    Metadata
    Show full item record
    Abstract
    AbstractIn design–build (DB) projects, the design–builder is engaged before the design is fully completed, embedding unknown factors, such as subsurface conditions and design commitments, into the project. Given the limited time available for procurement, ...
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4311902
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV