| dc.contributor.author | Tao, Sha | |
| dc.contributor.author | Yu, Junying | |
| dc.contributor.author | Zhu, Jianbo | |
| dc.contributor.author | Chen, Shiwei | |
| dc.contributor.author | Li, Xiao | |
| dc.date.accessioned | 2026-08-20T10:42:42Z | |
| dc.date.available | 2026-08-20T10:42:42Z | |
| dc.date.copyright | 2026/03/11 | |
| dc.date.issued | 2026 | |
| dc.identifier.other | JCEMD4.COENG-17505.pdf | |
| dc.identifier.uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4311156 | |
| dc.description.abstract | AbstractPrecast component (PC) production is a critical stage within the prefabricated construction
supply chain. Motivated by a practical challenge observed in PC manufacturing, this
study investigates an integrated PC production scheduling problem that ... | |
| dc.publisher | American Society of Civil Engineers | |
| dc.title | Precast Component Production Scheduling Considering Outsourcing and Multiskilled Resources | |
| dc.type | Journal Article | |
| dc.journal.volume | 152 | |
| dc.journal.issue | 5 | |
| dc.journal.title | Journal of Construction Engineering and Management | |
| dc.identifier.doi | 10.1061/JCEMD4.COENG-17505 | |
| dc.journal.fristpage | 04026040-1 | |
| dc.journal.lastpage | 04026040-18 | |
| dc.page | 18 | |
| dc.tree | Journal of Construction Engineering and Management:;2026:;Volume ( 152 ):;issue: 005 | |
| dc.contenttype | Fulltext | |