• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Precast Component Production Scheduling Considering Outsourcing and Multiskilled Resources

    Thumbnail
    View/Open
    JCEMD4.COENG-17505.pdf (4.327Mb)
    Date
    2026
    Author
    Tao, Sha
    Yu, Junying
    Zhu, Jianbo
    Chen, Shiwei
    Li, Xiao
    Metadata
    Show full item record
    Abstract
    AbstractPrecast component (PC) production is a critical stage within the prefabricated construction supply chain. Motivated by a practical challenge observed in PC manufacturing, this study investigates an integrated PC production scheduling problem that ...
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4311156
    Collections
    • Journal of Construction Engineering and Management

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV