dc.description.abstractAbstractAlthough labor resource allocation is critical in the labor-intensive construction industry, it is typically performed only after the schedule has been determined. This “schedule leads, labor follows” paradigm not only sidelines labor’s role in ...Practical ApplicationsThis study presents an AN3-NF model for the integrated optimization of construction scheduling and labor resource allocation, offering significant practical value. Adaptive parameter tuning and building information modeling (BIM) ...
dc.publisherAmerican Society of Civil Engineers
dc.titleMultiobjective Construction Schedule Optimization with Labor Resource Allocation: Coupling Parameter-Adaptive Genetic Algorithm and Network Flow
dc.typeJournal Article
dc.journal.volume152
dc.journal.issue5
dc.journal.titleJournal of Construction Engineering and Management
dc.identifier.doi10.1061/JCEMD4.COENG-17127
dc.journal.fristpage04026053-1
dc.journal.lastpage04026053-26
dc.page26
dc.treeJournal of Construction Engineering and Management:;2026:;Volume ( 152 ):;issue: 005
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record