    Multiobjective Construction Schedule Optimization with Labor Resource Allocation: Coupling Parameter-Adaptive Genetic Algorithm and Network Flow

    Thumbnail
    View/Open
    JCEMD4.COENG-17127.pdf (11.92Mb)
    Date
    2026
    Author
    Li, Yue
    Gao, Rui
    Wu, Haitao
    Wen, Jiangtao
    Li, Tianxiang
    Dong, Xiaoqin
    Metadata
    Show full item record
    Abstract
    AbstractAlthough labor resource allocation is critical in the labor-intensive construction industry, it is typically performed only after the schedule has been determined. This “schedule leads, labor follows” paradigm not only sidelines labor’s role in ...Practical ApplicationsThis study presents an AN3-NF model for the integrated optimization of construction scheduling and labor resource allocation, offering significant practical value. Adaptive parameter tuning and building information modeling (BIM) ...
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4311116
    Collections
    • Journal of Construction Engineering and Management

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV