dc.contributor.authorEamon, Christopher
dc.contributor.authorShinki, Kazuhiko
dc.contributor.authorWong, Kin Hang
dc.contributor.authorAlsendi, Ahmad
dc.date.accessioned2026-08-20T10:40:39Z
dc.date.available2026-08-20T10:40:39Z
dc.date.copyright2025/09/16
dc.date.issued2025
dc.identifier.otherJCEMD4.COENG-17052.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4311109
dc.description.abstractAbstractA pay item specific case–based reasoning (PCBR) approach was developed and assessed for estimation of bridge repair and replacement unit costs. Rather than predict overall project or unit cost as with typical case-based reasoning (CBR) methods, ...Practical ApplicationsThe case-based reasoning (CBR) method has been shown to be an effective way to improve the accuracy of cost estimates. CBR is based on the idea of using the costs of previous, similar projects to estimate the cost of a future ...
dc.publisherAmerican Society of Civil Engineers
dc.titleAssessment of Pay Item Specific Case–Based Reasoning Approach for Bridge Unit Cost Estimation
dc.typeJournal Article
dc.journal.volume151
dc.journal.issue12
dc.journal.titleJournal of Construction Engineering and Management
dc.identifier.doi10.1061/JCEMD4.COENG-17052
dc.journal.fristpage04025188-1
dc.journal.lastpage04025188-12
dc.page12
dc.treeJournal of Construction Engineering and Management:;2025:;Volume ( 151 ):;issue: 012