• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Assessment of Pay Item Specific Case–Based Reasoning Approach for Bridge Unit Cost Estimation

    Thumbnail
    View/Open
    JCEMD4.COENG-17052.pdf (472.8Kb)
    Date
    2025
    Author
    Eamon, Christopher
    Shinki, Kazuhiko
    Wong, Kin Hang
    Alsendi, Ahmad
    Metadata
    Show full item record
    Abstract
    AbstractA pay item specific case–based reasoning (PCBR) approach was developed and assessed for estimation of bridge repair and replacement unit costs. Rather than predict overall project or unit cost as with typical case-based reasoning (CBR) methods, ...Practical ApplicationsThe case-based reasoning (CBR) method has been shown to be an effective way to improve the accuracy of cost estimates. CBR is based on the idea of using the costs of previous, similar projects to estimate the cost of a future ...
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4311109
    Collections
    • Journal of Construction Engineering and Management

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV