| dc.contributor.author | Jadidoleslami, Samereh | |
| dc.contributor.author | Azizi, Mojtaba | |
| dc.contributor.author | Sobhiyah, Mohammadhossein | |
| dc.contributor.author | Zareravasan, Ahad | |
| dc.date.accessioned | 2026-08-20T10:38:21Z | |
| dc.date.available | 2026-08-20T10:38:21Z | |
| dc.date.copyright | 2025/11/19 | |
| dc.date.issued | 2026 | |
| dc.identifier.other | JCEMD4.COENG-16775.pdf | |
| dc.identifier.uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4311057 | |
| dc.description.abstract | AbstractDigital transformation (DT) in construction firms faces complex, interdependent barriers
across individual, organizational, and metaorganizational levels, slowing adoption
in a competitive industry. Prior studies often examined isolated factors, ...Practical ApplicationsThis study provides construction firms with a roadmap to navigate DT by identifying
18 critical factors and their interdependencies across individual, organizational,
and metaorganizational levels. Using the results of this research, ... | |
| dc.publisher | American Society of Civil Engineers | |
| dc.title | A Cross-Impact Analysis of Digital Transformation Factors in Construction Firms: A Multilevel MICMAC Analysis | |
| dc.type | Journal Article | |
| dc.journal.volume | 152 | |
| dc.journal.issue | 2 | |
| dc.journal.title | Journal of Construction Engineering and Management | |
| dc.identifier.doi | 10.1061/JCEMD4.COENG-16775 | |
| dc.journal.fristpage | 04025243-1 | |
| dc.journal.lastpage | 04025243-15 | |
| dc.page | 15 | |
| dc.tree | Journal of Construction Engineering and Management:;2026:;Volume ( 152 ):;issue: 002 | |
| dc.contenttype | Fulltext | |