• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Joint Optimization of Critical Concession Parameters for Sustainable PPP Contracts

    Thumbnail
    View/Open
    JCEMD4.COENG-15577.pdf (3.328Mb)
    Date
    2025
    Author
    Hongyu Jin
    Melissa Chan
    Yang Bai
    Metadata
    Show full item record
    Abstract
    To fully leverage the advantages of the public–private partnership (PPP) model in delivering sustainable infrastructures, the values of critical concession parameters need to be determined. Traditional determination methods overlook the sustainability benefits of the projects, which hinders their application on sustainable infrastructures financed as PPPs. This research enriches the risk allocation scenarios by quantifying the sustainability benefits and develops a multiparameter joint determination method according to fair-risk allocation and game equilibrium principles. This research presents an innovative concept of value-for-money risk and highlights the fact that for sustainable PPP contracts, the concession parameters should be determined for reasonably shared value-for-money risks instead of revenue risks. Project JZ is created as a numerical example to verify the applicability of the proposed method. The result shows that the proposed method can determine the optimal values of concession period, concession price, and minimum revenue guarantee (MRG), which contribute to a win–win outcome in achieving the goals of financial and sustainability benefits for both public and private parties. The data analysis reveals that achieving the equilibrium risk-sharing ratio for value-for-money risks requires a shorter concession period or a decreased MRG level than revenue risks. Also, higher concession prices correlate with shorter concession periods and increased MRG levels.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4309367
    Collections
    • Journal of Construction Engineering and Management

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV