Show simple item record

dc.contributor.authorJia Wang
dc.contributor.authorWei Huang
dc.contributor.authorYahan Chen
dc.date.accessioned2026-02-16T21:32:05Z
dc.date.available2026-02-16T21:32:05Z
dc.date.copyright2025/02/01
dc.date.issued2025
dc.identifier.otherJCEMD4.COENG-15311.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4309350
dc.description.abstractStochastic time-cost trade-off (TCT) problems are of significant concern to project managers because various uncertain factors have to be considered when making appropriate balance between project completion time and cost. In the paper we consider the stochastic TCT problem, where the project completion time (PCT) unreliability is involved and constrained to be less than a prescribed threshold. To tackle the concerned problem, previous studies have implemented the double loop procedure, where a genetic algorithm (GA) is used in the outer loop for optimization, and Monte Carlo simulation (MCS) is used in the inner loop for examining the unreliability constraint. The original double loop procedure is computationally inefficient, taking hours or days even for a small to medium project. The present study proposes an efficient simulation method, referred to as adaptive domain decomposition method (DDM), to replace MCS for credibly examining the unreliability constraint. By modifying the double loop procedure with adaptive DDM, the computational resources can be effectively allocated, and the computational efficiency can be greatly improved. As shown in the illustrative example, the modified procedure significantly outperforms the original procedure, and it is hundreds of times faster to obtain similar optimization results. With the great efficiency improvement, this study contributes to the widespread acceptance of stochastic TCT analysis in practical applications.
dc.publisherAmerican Society of Civil Engineers
dc.titleSolving Stochastic Time-Cost Trade-Off Problems via Modified Double-Loop Procedure with Adaptive Domain Decomposition Method
dc.typeJournal Article
dc.journal.volume151
dc.journal.issue2
dc.journal.titleJournal of Construction Engineering and Management
dc.identifier.doi10.1061/JCEMD4.COENG-15311
dc.journal.fristpage04024199-1
dc.journal.lastpage04024199-13
dc.page13
dc.treeJournal of Construction Engineering and Management:;2025:;Volume ( 151 ):;issue: 002
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record