• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Solving Stochastic Time-Cost Trade-Off Problems via Modified Double-Loop Procedure with Adaptive Domain Decomposition Method

    Thumbnail
    View/Open
    JCEMD4.COENG-15311.pdf (2.093Mb)
    Date
    2025
    Author
    Jia Wang
    Wei Huang
    Yahan Chen
    Metadata
    Show full item record
    Abstract
    Stochastic time-cost trade-off (TCT) problems are of significant concern to project managers because various uncertain factors have to be considered when making appropriate balance between project completion time and cost. In the paper we consider the stochastic TCT problem, where the project completion time (PCT) unreliability is involved and constrained to be less than a prescribed threshold. To tackle the concerned problem, previous studies have implemented the double loop procedure, where a genetic algorithm (GA) is used in the outer loop for optimization, and Monte Carlo simulation (MCS) is used in the inner loop for examining the unreliability constraint. The original double loop procedure is computationally inefficient, taking hours or days even for a small to medium project. The present study proposes an efficient simulation method, referred to as adaptive domain decomposition method (DDM), to replace MCS for credibly examining the unreliability constraint. By modifying the double loop procedure with adaptive DDM, the computational resources can be effectively allocated, and the computational efficiency can be greatly improved. As shown in the illustrative example, the modified procedure significantly outperforms the original procedure, and it is hundreds of times faster to obtain similar optimization results. With the great efficiency improvement, this study contributes to the widespread acceptance of stochastic TCT analysis in practical applications.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4309350
    Collections
    • Journal of Construction Engineering and Management

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV