dc.description.abstractLong-distance tunnel construction involves a sequence of construction operations that are influenced by various uncertain factors. Accurate operation duration prediction is critical to inform long-distance tunnel construction management and decision-making. In this study, a novel operation duration prediction method called random forest improved by whale optimization algorithm (WOA-RF) is proposed by considering geological conditions—the most significant uncertain factor in long-distance tunnel construction. Firstly, a geological uncertainty prediction model was established to estimate probability of geological conditions along the tunnel. Secondly, factors influencing the durations of five key construction operations, i.e., drilling, charge blasting, mucking, supporting steel frame, and shotcrete were analyzed. A prediction model for the concerned operation durations was established using the WOA-RF. Furthermore, considering the uncertainty of tunnel geological conditions, a method for calculating the expected operation duration related to a certain geological condition was proposed. Effectiveness of the proposed WOA-RF model is demonstrated in a case study, showing better performance in terms of average absolute error, root mean square error, and determination coefficient than RF model. The proposed approach can be used to inform the arrival time of the subsequent team in real time during construction, and predict the construction progress to provide a scientific basis for scheduling and timely controlling the long-distance tunnel construction progress under geological uncertainties.
dc.publisherAmerican Society of Civil Engineers
dc.titleAn Improved Random Forest–Based Operation Duration Prediction of Long-Distance Tunnel Construction Considering Geological Uncertainty
dc.typeJournal Article
dc.journal.volume39
dc.journal.issue2
dc.journal.titleJournal of Computing in Civil Engineering
dc.identifier.doi10.1061/JCCEE5.CPENG-6041
dc.journal.fristpage04024060-1
dc.journal.lastpage04024060-15
dc.page15
dc.treeJournal of Computing in Civil Engineering:;2025:;Volume ( 039 ):;issue: 002
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record