• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    An Improved Random Forest–Based Operation Duration Prediction of Long-Distance Tunnel Construction Considering Geological Uncertainty

    Thumbnail
    View/Open
    JCCEE5.CPENG-6041.pdf (1.615Mb)
    Date
    2025
    Author
    Donghai Liu
    Qianxin Dai
    Xinlin Tang
    Rui Zhang
    Tingjie Lu
    Junjie Chen
    Metadata
    Show full item record
    Abstract
    Long-distance tunnel construction involves a sequence of construction operations that are influenced by various uncertain factors. Accurate operation duration prediction is critical to inform long-distance tunnel construction management and decision-making. In this study, a novel operation duration prediction method called random forest improved by whale optimization algorithm (WOA-RF) is proposed by considering geological conditions—the most significant uncertain factor in long-distance tunnel construction. Firstly, a geological uncertainty prediction model was established to estimate probability of geological conditions along the tunnel. Secondly, factors influencing the durations of five key construction operations, i.e., drilling, charge blasting, mucking, supporting steel frame, and shotcrete were analyzed. A prediction model for the concerned operation durations was established using the WOA-RF. Furthermore, considering the uncertainty of tunnel geological conditions, a method for calculating the expected operation duration related to a certain geological condition was proposed. Effectiveness of the proposed WOA-RF model is demonstrated in a case study, showing better performance in terms of average absolute error, root mean square error, and determination coefficient than RF model. The proposed approach can be used to inform the arrival time of the subsequent team in real time during construction, and predict the construction progress to provide a scientific basis for scheduling and timely controlling the long-distance tunnel construction progress under geological uncertainties.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4309254
    Collections
    • Journal of Computing in Civil Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV