• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Team Selection and Cost Deviation Sharing in IPD Systems for Emerging Markets: A Cooperative Game Theory Approach

    Thumbnail
    View/Open
    JLADAH.LADR-1221.pdf (647.1Kb)
    Date
    2025
    Author
    Yomna Emad
    Mohamed S. Eid
    Hesham A. Bassioni
    Metadata
    Show full item record
    Abstract
    Regardless of its ability to efficiently achieve the projects’ goals, integrated project delivery (IPD) is one of the project delivery systems (PDSs) that is seldom used in emerging markets due to its unfamiliarity in the region and significant differences from traditional PDS. To bridge between the traditional PDS and IPDs in emerging markets, this study proposes a temporary transitional model that (1) selects the IPD project parties that have the highest expected positive impact on the project; and (2) fairly distributes the project cost deviations among the stakeholders based on their marginal contribution. The research discusses the team formation and selection phase and the procurement and construction phase of the IPD project by applying best value procurement methodology while integrating the target band concept into earned value management (EVM) and finally utilizing cooperative game theory. The proposed model was applied to case studies adopted from the literature. Published project budgets were used to illustrate the proposed methodology and resemble the model’s applicability. Results reflected the model’s flexibility and adaptability to different cases. Using the Shapley value, the cost deviations were fairly distributed, highlighting the owner’s essential contribution to the project’s success. Results revealed that each participant’s share reflected their impact and contribution at each milestone during the project course. Results implied that the proposed model’s application best fits the shift between the traditional PDS and the IPD mindsets in emerging markets. This research contributes to the body of knowledge by proposing more common practice methods for IPD in emerging markets to ensure the fast-growing construction market in different regions is benefiting from the novel delivery method.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4307533
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV