YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Team Selection and Cost Deviation Sharing in IPD Systems for Emerging Markets: A Cooperative Game Theory Approach

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2025:;Volume ( 017 ):;issue: 002::page 04525005-1
    Author:
    Yomna Emad
    ,
    Mohamed S. Eid
    ,
    Hesham A. Bassioni
    DOI: 10.1061/JLADAH.LADR-1221
    Publisher: American Society of Civil Engineers
    Abstract: Regardless of its ability to efficiently achieve the projects’ goals, integrated project delivery (IPD) is one of the project delivery systems (PDSs) that is seldom used in emerging markets due to its unfamiliarity in the region and significant differences from traditional PDS. To bridge between the traditional PDS and IPDs in emerging markets, this study proposes a temporary transitional model that (1) selects the IPD project parties that have the highest expected positive impact on the project; and (2) fairly distributes the project cost deviations among the stakeholders based on their marginal contribution. The research discusses the team formation and selection phase and the procurement and construction phase of the IPD project by applying best value procurement methodology while integrating the target band concept into earned value management (EVM) and finally utilizing cooperative game theory. The proposed model was applied to case studies adopted from the literature. Published project budgets were used to illustrate the proposed methodology and resemble the model’s applicability. Results reflected the model’s flexibility and adaptability to different cases. Using the Shapley value, the cost deviations were fairly distributed, highlighting the owner’s essential contribution to the project’s success. Results revealed that each participant’s share reflected their impact and contribution at each milestone during the project course. Results implied that the proposed model’s application best fits the shift between the traditional PDS and the IPD mindsets in emerging markets. This research contributes to the body of knowledge by proposing more common practice methods for IPD in emerging markets to ensure the fast-growing construction market in different regions is benefiting from the novel delivery method.
    • Download: (647.1Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Team Selection and Cost Deviation Sharing in IPD Systems for Emerging Markets: A Cooperative Game Theory Approach

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4307533
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorYomna Emad
    contributor authorMohamed S. Eid
    contributor authorHesham A. Bassioni
    date accessioned2025-08-17T22:50:36Z
    date available2025-08-17T22:50:36Z
    date copyright5/1/2025 12:00:00 AM
    date issued2025
    identifier otherJLADAH.LADR-1221.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4307533
    description abstractRegardless of its ability to efficiently achieve the projects’ goals, integrated project delivery (IPD) is one of the project delivery systems (PDSs) that is seldom used in emerging markets due to its unfamiliarity in the region and significant differences from traditional PDS. To bridge between the traditional PDS and IPDs in emerging markets, this study proposes a temporary transitional model that (1) selects the IPD project parties that have the highest expected positive impact on the project; and (2) fairly distributes the project cost deviations among the stakeholders based on their marginal contribution. The research discusses the team formation and selection phase and the procurement and construction phase of the IPD project by applying best value procurement methodology while integrating the target band concept into earned value management (EVM) and finally utilizing cooperative game theory. The proposed model was applied to case studies adopted from the literature. Published project budgets were used to illustrate the proposed methodology and resemble the model’s applicability. Results reflected the model’s flexibility and adaptability to different cases. Using the Shapley value, the cost deviations were fairly distributed, highlighting the owner’s essential contribution to the project’s success. Results revealed that each participant’s share reflected their impact and contribution at each milestone during the project course. Results implied that the proposed model’s application best fits the shift between the traditional PDS and the IPD mindsets in emerging markets. This research contributes to the body of knowledge by proposing more common practice methods for IPD in emerging markets to ensure the fast-growing construction market in different regions is benefiting from the novel delivery method.
    publisherAmerican Society of Civil Engineers
    titleTeam Selection and Cost Deviation Sharing in IPD Systems for Emerging Markets: A Cooperative Game Theory Approach
    typeJournal Article
    journal volume17
    journal issue2
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/JLADAH.LADR-1221
    journal fristpage04525005-1
    journal lastpage04525005-15
    page15
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2025:;Volume ( 017 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian