Show simple item record

dc.contributor.authorLiu, Wu
dc.contributor.authorYang, Xin’ an
dc.contributor.authorCao, Xingbin
dc.contributor.authorXiong, Lin
dc.contributor.authorLiu, Zongsheng
dc.date.accessioned2025-04-21T10:33:40Z
dc.date.available2025-04-21T10:33:40Z
dc.date.copyright2/7/2025 12:00:00 AM
dc.date.issued2025
dc.identifier.issn0094-9930
dc.identifier.otherpvt_147_03_031001.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4306443
dc.description.abstractA continuously undulating pipeline results in the accumulation of air at high points and liquid at low points during commissioning, hindering the process, and impacting oil product quality. Cavitation may occur at the crossover point, especially for high saturated vapor pressure oils, potentially causing water strikes and pipeline damage. This study focuses on the BZ pipeline, transporting high saturated vapor pressure condensate in a varied terrain. It proposes the “oil injection after water isolation section” commissioning method and develops 20 commissioning schemes based on site conditions. A multiphase flow simulation model investigates the effects of pipeline flowrate and water injection length on start pressure, high point liquid retention, crossover point pressure, low point liquid retention, and liquid accumulation time. A preferred commissioning scheme suggests a pipeline flowrate of 192 m3/h–240 m3/h and a water injection length of 133 km. Commissioning schematics and operation schedules are devised accordingly. Optimization shows that increasing pipeline flowrate reduces low point fluid accumulation time. For downhill pipeline sections, extending water injection length does not enhance liquid retention at crossover points or improve pipeline exhaust, risking high pressure at low points. During oil–water injection transitions, maintaining a high delivery rate minimizes pressure fluctuations due to density differences. Following this scheme, pig wear along the BZ pipeline was even, and crossover point 2# and valve chamber No. 10 showed good exhaust conditions. Optimizing key parameters and commissioning scheme formulation effectively guide BZ condensate pipeline commissioning, ensuring safety.
dc.publisherThe American Society of Mechanical Engineers (ASME)
dc.titleOptimization of High-Vapor Pressure Condensate Pipeline Commissioning Schemes in Large Uplift Environments
dc.typeJournal Paper
dc.journal.volume147
dc.journal.issue3
dc.journal.titleJournal of Pressure Vessel Technology
dc.identifier.doi10.1115/1.4067677
dc.journal.fristpage31001-1
dc.journal.lastpage31001-11
dc.page11
dc.treeJournal of Pressure Vessel Technology:;2025:;volume( 147 ):;issue: 003
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record