• Login
    View Item 
    •   DSpace Home
    • ASME
    • Journal of Pressure Vessel Technology
    • View Item
    •   DSpace Home
    • ASME
    • Journal of Pressure Vessel Technology
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Optimization of High-Vapor Pressure Condensate Pipeline Commissioning Schemes in Large Uplift Environments

    Thumbnail
    View/Open
    pvt_147_03_031001.pdf (2.841Mb)
    Date
    2025
    Author
    Liu, Wu
    Yang, Xin’ an
    Cao, Xingbin
    Xiong, Lin
    Liu, Zongsheng
    Metadata
    Show full item record
    Abstract
    A continuously undulating pipeline results in the accumulation of air at high points and liquid at low points during commissioning, hindering the process, and impacting oil product quality. Cavitation may occur at the crossover point, especially for high saturated vapor pressure oils, potentially causing water strikes and pipeline damage. This study focuses on the BZ pipeline, transporting high saturated vapor pressure condensate in a varied terrain. It proposes the “oil injection after water isolation section” commissioning method and develops 20 commissioning schemes based on site conditions. A multiphase flow simulation model investigates the effects of pipeline flowrate and water injection length on start pressure, high point liquid retention, crossover point pressure, low point liquid retention, and liquid accumulation time. A preferred commissioning scheme suggests a pipeline flowrate of 192 m3/h–240 m3/h and a water injection length of 133 km. Commissioning schematics and operation schedules are devised accordingly. Optimization shows that increasing pipeline flowrate reduces low point fluid accumulation time. For downhill pipeline sections, extending water injection length does not enhance liquid retention at crossover points or improve pipeline exhaust, risking high pressure at low points. During oil–water injection transitions, maintaining a high delivery rate minimizes pressure fluctuations due to density differences. Following this scheme, pig wear along the BZ pipeline was even, and crossover point 2# and valve chamber No. 10 showed good exhaust conditions. Optimizing key parameters and commissioning scheme formulation effectively guide BZ condensate pipeline commissioning, ensuring safety.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4306443
    Collections
    • Journal of Pressure Vessel Technology

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV