dc.contributor.authorMohammadzadeh, Navid
dc.contributor.authorTruong-Ba, Huy
dc.contributor.authorPicotti, Giovanni
dc.contributor.authorCholette, Michael E.
dc.date.accessioned2024-04-24T22:46:03Z
dc.date.available2024-04-24T22:46:03Z
dc.date.copyright3/7/2024 12:00:00 AM
dc.date.issued2024
dc.identifier.issn0199-6231
dc.identifier.othersol_146_4_041005.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4295836
dc.description.abstractSolar tower with thermal energy storage (ST-TES) represents a promising technology for large-scale exploitation of solar irradiation for electricity generation. A ST-TES has the potential to extend electricity generation to more favorable conditions, such as high electricity prices. The size of TES, however, constrains the flexibility of dispatching, especially when there is significant uncertainty in forecasts of solar irradiation and electricity prices. This study explores the impact of TES size when the plant uses model-predictive control (MPC) for dispatch planning. The performance of MPC is benchmarked against one perfect knowledge (PK) and two day-ahead strategies. The optimal achievable profit for each TES size is determined using the PK strategy. An analysis is conducted to evaluate the relative profit losses for all the other simulated strategies compared to the PK strategy. A case study is conducted for a hypothetical 115 MWe ST-TES in South Australia. For January and August, 100 tests are performed for each dispatch policy, with the TES size varying from 6 to 14 h. The revenue evaluation is conducted with both fixed and wholesale spot prices. The analysis shows that MPC-aided dispatching enables the adoption of a smaller TES compared to day-ahead policies while maintaining the same expected profit. The resulting TES size reduction from 14 to 10 h translates into approximately up to $45.4 million in capital cost savings. The findings of this study can inform the ST-TES plant’s design procedures and facilitate negotiations for electricity sales contracts.
dc.publisherThe American Society of Mechanical Engineers (ASME)
dc.titleAssessment of Storage Sizing for Solar Tower Plants Using Model-Predictive Control for Dispatch Planning
dc.typeJournal Paper
dc.journal.volume146
dc.journal.issue4
dc.journal.titleJournal of Solar Energy Engineering
dc.identifier.doi10.1115/1.4064504
dc.journal.fristpage41005-1
dc.journal.lastpage41005-13
dc.page13
dc.treeJournal of Solar Energy Engineering:;2024:;volume( 146 ):;issue: 004
dc.contenttypeFulltext