• Login
    View Item 
    •   DSpace Home
    • ASME
    • ASME Open Journal of Engineering
    • View Item
    •   DSpace Home
    • ASME
    • ASME Open Journal of Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Offshore Logistics: Scenario Planning and Installation Modeling of Floating Offshore Wind Projects

    Thumbnail
    View/Open
    aoje_2_021013.pdf (1.138Mb)
    Date
    2023
    Author
    Torres, Esperanza Susana
    Thies, Philipp R.
    Lawless, Mark
    Metadata
    Show full item record
    Abstract
    The offshore installation, logistics, and commissioning activities are currently estimated to make up 20% to 30% of the capital expenditures (CAPEX) of offshore wind projects. Technical and geographical factors affect both the CAPEX during construction and the installation schedule, such as a lack of supporting port infrastructure, the availability of specialized vessels, the distance from the wind farm to shore, accessibility, water depths, and seabed conditions. In addition, there are significant risks during the construction phase, such as uncertain durations due to the sensitivity of marine operations to weather conditions. Identifying supply chain requirements is critical in the early stages of project planning in order to avoid time delays and cost overruns during the transport and installation process. This study explores and analyzes the logistic requirements and installation methods of a floating offshore wind (FOW) technology. Using an advanced forecasting and decision support tool, realistic case scenarios are simulated at a variety of potential sites for FOW deployment across the UK. Technical risks associated with installation strategies are identified and classified. The results provide a comparison of key installation performance indicators of each case scenario (e.g., installation rate per wind turbine, weather downtime). This study is of interest to researchers, offshore wind project developers, service providers, and other key stakeholders seeking to optimize planning and logistics to drive down CAPEX costs, reduce the construction downtime, and minimize risks during marine operations.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4291800
    Collections
    • ASME Open Journal of Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV