• Login
    View Item 
    •   DSpace Home
    • ASCE
    • International Journal of Geomechanics
    • View Item
    •   DSpace Home
    • ASCE
    • International Journal of Geomechanics
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Coupled FDM–DEM Method for Analyzing EPBS Machine Tunneling Performance in Boulders

    Thumbnail
    View/Open
    %28ASCE%29GM.1943-5622.0002594.pdf (5.051Mb)
    Date
    2022/12/01
    Author
    Xiaokang Shao
    Zhiyong Yang
    Yusheng Jiang
    Jili Feng
    Metadata
    Show full item record
    Abstract
    This work focuses on the development of a three-dimensional shield tunneling model coupling the finite-difference method (FDM) with the discrete-element method (DEM) and evaluates its tunneling performance in boulders. The tunneling process of cutterhead rotation, cutting the formation, soil entering the chamber, and discharging of the screw conveyor is simulated to explain the characteristics of particle movement in front of the tunnel face. The range of the soil failure zone under different shield discharge ratios is determined by the correlation between the discharge ratio and the tunnel surface stability. The evolution process of the soil arching effect in the boulders along with shield tunneling is investigated to understand the mechanisms of the delay settlement in the boulders. Subsequently, the shield discharge ratio is optimized by investigating its influence on the surface deformation. Finally, the average stress distribution on the shield cutterhead in the tunneling process is analyzed to provide the scheme of the cutterhead structure and arrangement. This work can be referred for evaluating the shield tunneling performance and optimizing the excavation design scheme of shield machines during tunneling construction under similar geological conditions. The coupled finite-difference method (FDM)–discrete-element method (DEM) calculation method proposed in this study was successfully applied for boring tunnel equipment performance analysis in Beijing Metro Line 16. This shield tunnel was excavated in the strata with boulders rich in large size and high strength, and the previous tunneling experience shows that the shield is prone to encountering accidents such as tool damage and cutterhead jamming by large boulders when tunneling in such strata. Based on the present parametric analysis and calculation results, the suitable engineering suggestions have been proposed to enhance the shield equipment specifically, such as strengthening the central and peripheral cutters and the wear resistance of the cutterhead sides. In addition, the cutterhead opening and band-type screw conveyor were also adjusted to allow large size stones to pass through the cutterhead and discharge from the soil chamber as much as possible instead of being broken by the cutters. The adoption of these techniques has made it possible for the earth pressure balance shield (EPBS) machine to continuously excavate 1,300 m in boulders without cutter exchanges.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4289143
    Collections
    • International Journal of Geomechanics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV