YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • International Journal of Geomechanics
    • View Item
    •   YE&T Library
    • ASCE
    • International Journal of Geomechanics
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Coupled FDM–DEM Method for Analyzing EPBS Machine Tunneling Performance in Boulders

    Source: International Journal of Geomechanics:;2022:;Volume ( 022 ):;issue: 012::page 04022239
    Author:
    Xiaokang Shao
    ,
    Zhiyong Yang
    ,
    Yusheng Jiang
    ,
    Jili Feng
    DOI: 10.1061/(ASCE)GM.1943-5622.0002594
    Publisher: ASCE
    Abstract: This work focuses on the development of a three-dimensional shield tunneling model coupling the finite-difference method (FDM) with the discrete-element method (DEM) and evaluates its tunneling performance in boulders. The tunneling process of cutterhead rotation, cutting the formation, soil entering the chamber, and discharging of the screw conveyor is simulated to explain the characteristics of particle movement in front of the tunnel face. The range of the soil failure zone under different shield discharge ratios is determined by the correlation between the discharge ratio and the tunnel surface stability. The evolution process of the soil arching effect in the boulders along with shield tunneling is investigated to understand the mechanisms of the delay settlement in the boulders. Subsequently, the shield discharge ratio is optimized by investigating its influence on the surface deformation. Finally, the average stress distribution on the shield cutterhead in the tunneling process is analyzed to provide the scheme of the cutterhead structure and arrangement. This work can be referred for evaluating the shield tunneling performance and optimizing the excavation design scheme of shield machines during tunneling construction under similar geological conditions. The coupled finite-difference method (FDM)–discrete-element method (DEM) calculation method proposed in this study was successfully applied for boring tunnel equipment performance analysis in Beijing Metro Line 16. This shield tunnel was excavated in the strata with boulders rich in large size and high strength, and the previous tunneling experience shows that the shield is prone to encountering accidents such as tool damage and cutterhead jamming by large boulders when tunneling in such strata. Based on the present parametric analysis and calculation results, the suitable engineering suggestions have been proposed to enhance the shield equipment specifically, such as strengthening the central and peripheral cutters and the wear resistance of the cutterhead sides. In addition, the cutterhead opening and band-type screw conveyor were also adjusted to allow large size stones to pass through the cutterhead and discharge from the soil chamber as much as possible instead of being broken by the cutters. The adoption of these techniques has made it possible for the earth pressure balance shield (EPBS) machine to continuously excavate 1,300 m in boulders without cutter exchanges.
    • Download: (5.051Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Coupled FDM–DEM Method for Analyzing EPBS Machine Tunneling Performance in Boulders

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4289143
    Collections
    • International Journal of Geomechanics

    Show full item record

    contributor authorXiaokang Shao
    contributor authorZhiyong Yang
    contributor authorYusheng Jiang
    contributor authorJili Feng
    date accessioned2023-04-07T00:29:50Z
    date available2023-04-07T00:29:50Z
    date issued2022/12/01
    identifier other%28ASCE%29GM.1943-5622.0002594.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4289143
    description abstractThis work focuses on the development of a three-dimensional shield tunneling model coupling the finite-difference method (FDM) with the discrete-element method (DEM) and evaluates its tunneling performance in boulders. The tunneling process of cutterhead rotation, cutting the formation, soil entering the chamber, and discharging of the screw conveyor is simulated to explain the characteristics of particle movement in front of the tunnel face. The range of the soil failure zone under different shield discharge ratios is determined by the correlation between the discharge ratio and the tunnel surface stability. The evolution process of the soil arching effect in the boulders along with shield tunneling is investigated to understand the mechanisms of the delay settlement in the boulders. Subsequently, the shield discharge ratio is optimized by investigating its influence on the surface deformation. Finally, the average stress distribution on the shield cutterhead in the tunneling process is analyzed to provide the scheme of the cutterhead structure and arrangement. This work can be referred for evaluating the shield tunneling performance and optimizing the excavation design scheme of shield machines during tunneling construction under similar geological conditions. The coupled finite-difference method (FDM)–discrete-element method (DEM) calculation method proposed in this study was successfully applied for boring tunnel equipment performance analysis in Beijing Metro Line 16. This shield tunnel was excavated in the strata with boulders rich in large size and high strength, and the previous tunneling experience shows that the shield is prone to encountering accidents such as tool damage and cutterhead jamming by large boulders when tunneling in such strata. Based on the present parametric analysis and calculation results, the suitable engineering suggestions have been proposed to enhance the shield equipment specifically, such as strengthening the central and peripheral cutters and the wear resistance of the cutterhead sides. In addition, the cutterhead opening and band-type screw conveyor were also adjusted to allow large size stones to pass through the cutterhead and discharge from the soil chamber as much as possible instead of being broken by the cutters. The adoption of these techniques has made it possible for the earth pressure balance shield (EPBS) machine to continuously excavate 1,300 m in boulders without cutter exchanges.
    publisherASCE
    titleCoupled FDM–DEM Method for Analyzing EPBS Machine Tunneling Performance in Boulders
    typeJournal Article
    journal volume22
    journal issue12
    journal titleInternational Journal of Geomechanics
    identifier doi10.1061/(ASCE)GM.1943-5622.0002594
    journal fristpage04022239
    journal lastpage04022239_15
    page15
    treeInternational Journal of Geomechanics:;2022:;Volume ( 022 ):;issue: 012
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian