• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Management in Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Review of Critical Success Factors and Key Performance Indicators in Performance Assessment of P3 Transportation Projects

    Thumbnail
    View/Open
    %28ASCE%29ME.1943-5479.0001070.pdf (275.8Kb)
    Date
    2022/06/29
    Author
    Manik Ahmed
    Michael Garvin
    Metadata
    Show full item record
    Abstract
    What is a successful public–private partnership (P3)? The existing literature has continued to explore critical success factors (CSFs), key performance indicators (KPIs), and P3 drivers that are linked to P3 performance and outcomes, but some fundamental variations remain in the use of such factors and metrics to assess P3s. Studies have characterized CSFs as the “ingredients” necessary for P3 success and KPIs as the “metrics” to evaluate P3 outcomes or performance. As work in the area has progressed, the literature has evolved to consider CSFs and KPIs more holistically by broadening the factors considered to encompass social, political, economic, and financial categories. These areas in the literature are rather distinct, yet CSFs and KPIs sometimes serve as substitutes for one another, because the definition of and classification between CSFs and KPIs lack clarity. To address this issue, this work characterizes and synthesizes the literature on CSFs and KPIs to identify how to employ these factors and metrics to assess various aspects of P3 performance in transportation projects. CSFs identified were grouped into six categories such as project planning and environment and lifecycle perspectives, while KPIs were combined into four categories such as project delivery and socioeconomic. This work updates prior literature reviews, which is an important contribution because papers addressing CSFs and KPIs in P3s have increased in the last several years. Additionally, the distinction between CSFs and KPIs is clarified, and knowledge gaps such as the relationships between CSFs and future areas of research are presented.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4286466
    Collections
    • Journal of Management in Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV