Show simple item record

dc.contributor.authorXiao Li
dc.contributor.authorPan Liu
dc.contributor.authorBo Ming
dc.contributor.authorKangdi Huang
dc.contributor.authorWeifeng Xu
dc.contributor.authorYan Wen
dc.date.accessioned2022-05-07T20:34:26Z
dc.date.available2022-05-07T20:34:26Z
dc.date.issued2021-11-30
dc.identifier.other(ASCE)WR.1943-5452.0001510.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4282623
dc.description.abstractForward contract is a useful tool for hydropower producers to hedge revenue uncertainty sourced from varied spot prices. However, few studies have been explored to jointly derive the optimal forward contract and operating rules to guide hydropower operations. To address this issue, the following steps for cascade reservoirs are proposed: (1) a two-layer nested approach is used to derive optimal contract targets coordinated with operation trajectory (saying reservoir water level time series) by inputting deterministic inflows, (2) the forms of the operating rules are then identified based on the optimal operation trajectory from the first step, and (3) a simulation-based optimization approach is used to jointly refine the optimal contract and operating rules with the forms identified in the second step. With China’s Hubei Province as the market boundary, the Qing River cascade reservoir system was selected as the case study. The results show that (1) the two-layer nested approach could find the optimal deterministic operation together with contract targets; (2) the total cascade output is related to both available energy and spot price, with the coefficients of determination for each month mostly greater than 0.5; and (3) the refined operating rules and contract effectively improved the annual hydropower revenue by 3.65% ($14.15 million) compared to that of the conventional operating rules. The proposed method to jointly derive forward contract and operating rules is helpful for gaining more revenue under long-term hydropower operations.
dc.publisherASCE
dc.titleJoint Optimization of Forward Contract and Operating Rules for Cascade Hydropower Reservoirs
dc.typeJournal Paper
dc.journal.volume148
dc.journal.issue2
dc.journal.titleJournal of Water Resources Planning and Management
dc.identifier.doi10.1061/(ASCE)WR.1943-5452.0001510
dc.journal.fristpage04021099
dc.journal.lastpage04021099-12
dc.page12
dc.treeJournal of Water Resources Planning and Management:;2021:;Volume ( 148 ):;issue: 002
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record