• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Joint Optimization of Forward Contract and Operating Rules for Cascade Hydropower Reservoirs

    Thumbnail
    View/Open
    (ASCE)WR.1943-5452.0001510.pdf (1.927Mb)
    Date
    2021-11-30
    Author
    Xiao Li
    Pan Liu
    Bo Ming
    Kangdi Huang
    Weifeng Xu
    Yan Wen
    Metadata
    Show full item record
    Abstract
    Forward contract is a useful tool for hydropower producers to hedge revenue uncertainty sourced from varied spot prices. However, few studies have been explored to jointly derive the optimal forward contract and operating rules to guide hydropower operations. To address this issue, the following steps for cascade reservoirs are proposed: (1) a two-layer nested approach is used to derive optimal contract targets coordinated with operation trajectory (saying reservoir water level time series) by inputting deterministic inflows, (2) the forms of the operating rules are then identified based on the optimal operation trajectory from the first step, and (3) a simulation-based optimization approach is used to jointly refine the optimal contract and operating rules with the forms identified in the second step. With China’s Hubei Province as the market boundary, the Qing River cascade reservoir system was selected as the case study. The results show that (1) the two-layer nested approach could find the optimal deterministic operation together with contract targets; (2) the total cascade output is related to both available energy and spot price, with the coefficients of determination for each month mostly greater than 0.5; and (3) the refined operating rules and contract effectively improved the annual hydropower revenue by 3.65% ($14.15 million) compared to that of the conventional operating rules. The proposed method to jointly derive forward contract and operating rules is helpful for gaining more revenue under long-term hydropower operations.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4282623
    Collections
    • Journal of Water Resources Planning and Management

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV