    Utility Relocation Concept Plan for Mitigation of Utility Relocation Delays

    Thumbnail
    View/Open
    (ASCE)PS.1949-1204.0000630.pdf (5.948Mb)
    Date
    2021-12-08
    Author
    Garrett J. Coffin
    Jun Wang
    Isaac L. Howard
    Metadata
    Show full item record
    Abstract
    Utility conflicts are a primary cause of construction project delays. To mitigate delays, utility coordination is necessary. Existing utility coordination and communication studies lack an interactive method. This study aims to develop a method for utility coordination and utility conflict management that engages the utility owners early in the project development process to mitigate utility relocation delays. This study contributes to utility coordination by addressing the identified gap of improved incorporation of utility coordination processes into a project. This study provides and tests an interactive communication and model—utility relocation concept plan (URCP)—to develop utility conflict mitigation approaches that are agreeable between the utility owner, project owner, and contractor. URCP is a streamlined utility coordination technique and model that can be used in conjunction with current utility conflict management techniques in the industry. To the authors’ knowledge, a URCP is not currently in use in the industry outside of Kiewit Construction Corporation, nor is a URCP presented in the literature. The development of the URCP facilitates interactive visual discussions between the engineer, contractor, and utility owner. This interaction allows the relocations to be designed by all parties as well as provides advanced notification to the utility owners. Case study analysis revealed that when a URCP was utilized as a utility coordination tool, the amount of time it took to mitigate utility conflicts was reduced by 14.77%. Further research would be required to determine the viability of the URCP method in other geographic areas and other project delivery systems outside of design-build delivery projects.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4282220
    Collections
    • Journal of Pipeline Systems Engineering and Practice

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV