YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Pipeline Systems Engineering and Practice
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Pipeline Systems Engineering and Practice
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Utility Relocation Concept Plan for Mitigation of Utility Relocation Delays

    Source: Journal of Pipeline Systems Engineering and Practice:;2021:;Volume ( 013 ):;issue: 001::page 05021013
    Author:
    Garrett J. Coffin
    ,
    Jun Wang
    ,
    Isaac L. Howard
    DOI: 10.1061/(ASCE)PS.1949-1204.0000630
    Publisher: ASCE
    Abstract: Utility conflicts are a primary cause of construction project delays. To mitigate delays, utility coordination is necessary. Existing utility coordination and communication studies lack an interactive method. This study aims to develop a method for utility coordination and utility conflict management that engages the utility owners early in the project development process to mitigate utility relocation delays. This study contributes to utility coordination by addressing the identified gap of improved incorporation of utility coordination processes into a project. This study provides and tests an interactive communication and model—utility relocation concept plan (URCP)—to develop utility conflict mitigation approaches that are agreeable between the utility owner, project owner, and contractor. URCP is a streamlined utility coordination technique and model that can be used in conjunction with current utility conflict management techniques in the industry. To the authors’ knowledge, a URCP is not currently in use in the industry outside of Kiewit Construction Corporation, nor is a URCP presented in the literature. The development of the URCP facilitates interactive visual discussions between the engineer, contractor, and utility owner. This interaction allows the relocations to be designed by all parties as well as provides advanced notification to the utility owners. Case study analysis revealed that when a URCP was utilized as a utility coordination tool, the amount of time it took to mitigate utility conflicts was reduced by 14.77%. Further research would be required to determine the viability of the URCP method in other geographic areas and other project delivery systems outside of design-build delivery projects.
    • Download: (5.948Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Utility Relocation Concept Plan for Mitigation of Utility Relocation Delays

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4282220
    Collections
    • Journal of Pipeline Systems Engineering and Practice

    Show full item record

    contributor authorGarrett J. Coffin
    contributor authorJun Wang
    contributor authorIsaac L. Howard
    date accessioned2022-05-07T20:16:59Z
    date available2022-05-07T20:16:59Z
    date issued2021-12-08
    identifier other(ASCE)PS.1949-1204.0000630.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4282220
    description abstractUtility conflicts are a primary cause of construction project delays. To mitigate delays, utility coordination is necessary. Existing utility coordination and communication studies lack an interactive method. This study aims to develop a method for utility coordination and utility conflict management that engages the utility owners early in the project development process to mitigate utility relocation delays. This study contributes to utility coordination by addressing the identified gap of improved incorporation of utility coordination processes into a project. This study provides and tests an interactive communication and model—utility relocation concept plan (URCP)—to develop utility conflict mitigation approaches that are agreeable between the utility owner, project owner, and contractor. URCP is a streamlined utility coordination technique and model that can be used in conjunction with current utility conflict management techniques in the industry. To the authors’ knowledge, a URCP is not currently in use in the industry outside of Kiewit Construction Corporation, nor is a URCP presented in the literature. The development of the URCP facilitates interactive visual discussions between the engineer, contractor, and utility owner. This interaction allows the relocations to be designed by all parties as well as provides advanced notification to the utility owners. Case study analysis revealed that when a URCP was utilized as a utility coordination tool, the amount of time it took to mitigate utility conflicts was reduced by 14.77%. Further research would be required to determine the viability of the URCP method in other geographic areas and other project delivery systems outside of design-build delivery projects.
    publisherASCE
    titleUtility Relocation Concept Plan for Mitigation of Utility Relocation Delays
    typeJournal Paper
    journal volume13
    journal issue1
    journal titleJournal of Pipeline Systems Engineering and Practice
    identifier doi10.1061/(ASCE)PS.1949-1204.0000630
    journal fristpage05021013
    journal lastpage05021013-14
    page14
    treeJournal of Pipeline Systems Engineering and Practice:;2021:;Volume ( 013 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian