• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Stressing Sequence for Hanger Replacement of Tied-Arch Bridges with Rigid Bars

    Thumbnail
    View/Open
    (ASCE)BE.1943-5592.0001811.pdf (3.113Mb)
    Date
    2022-1-1
    Author
    Michele Fabio Granata
    Metadata
    Show full item record
    Abstract
    The construction of bridges with suspenders, such as cable-stayed or tied-arch bridges, needs deep study of the prestressing forces to be applied to stays or hangers in all stages, depending on the construction technique adopted. In these cases, the main issue is the determination of the initial forces and optimization of the prestressing system in terms of stressing values and sequence. When the bridge is already built and suspenders have to be replaced for maintenance, a different problem has to be faced by the engineer, because the sequence of replacements and the values of the axial stresses depend very much on the service conditions of the bridge and on its historical evolution from construction to maintenance. Furthermore, the technique used for the original suspension system is fundamental in designing the replacement intervention. In this paper hanger replacement of tied-arch bridges with rigid bars is focused on, inspired by an actual case of a steel bridge of medium span in which replacement of the hangers for the entire suspension system was demanded by the high state of corrosion. This posed the problem of how to replace the hangers, which stressing sequence was the most suitable, together with evaluation of the choices made in the original design for the suspension system, which did not provide for the possibility of calibrating the state of tension through onsite adjustments of hanger prestress. Assessment of the stressing sequence for hanger replacement is presented and discussed and the results of the study performed in the actual case study are shown.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4281972
    Collections
    • Journal of Bridge Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV