YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Stressing Sequence for Hanger Replacement of Tied-Arch Bridges with Rigid Bars

    Source: Journal of Bridge Engineering:;2022:;Volume ( 027 ):;issue: 001::page 04021099
    Author:
    Michele Fabio Granata
    DOI: 10.1061/(ASCE)BE.1943-5592.0001811
    Publisher: ASCE
    Abstract: The construction of bridges with suspenders, such as cable-stayed or tied-arch bridges, needs deep study of the prestressing forces to be applied to stays or hangers in all stages, depending on the construction technique adopted. In these cases, the main issue is the determination of the initial forces and optimization of the prestressing system in terms of stressing values and sequence. When the bridge is already built and suspenders have to be replaced for maintenance, a different problem has to be faced by the engineer, because the sequence of replacements and the values of the axial stresses depend very much on the service conditions of the bridge and on its historical evolution from construction to maintenance. Furthermore, the technique used for the original suspension system is fundamental in designing the replacement intervention. In this paper hanger replacement of tied-arch bridges with rigid bars is focused on, inspired by an actual case of a steel bridge of medium span in which replacement of the hangers for the entire suspension system was demanded by the high state of corrosion. This posed the problem of how to replace the hangers, which stressing sequence was the most suitable, together with evaluation of the choices made in the original design for the suspension system, which did not provide for the possibility of calibrating the state of tension through onsite adjustments of hanger prestress. Assessment of the stressing sequence for hanger replacement is presented and discussed and the results of the study performed in the actual case study are shown.
    • Download: (3.113Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Stressing Sequence for Hanger Replacement of Tied-Arch Bridges with Rigid Bars

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4281972
    Collections
    • Journal of Bridge Engineering

    Show full item record

    contributor authorMichele Fabio Granata
    date accessioned2022-05-07T20:05:12Z
    date available2022-05-07T20:05:12Z
    date issued2022-1-1
    identifier other(ASCE)BE.1943-5592.0001811.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4281972
    description abstractThe construction of bridges with suspenders, such as cable-stayed or tied-arch bridges, needs deep study of the prestressing forces to be applied to stays or hangers in all stages, depending on the construction technique adopted. In these cases, the main issue is the determination of the initial forces and optimization of the prestressing system in terms of stressing values and sequence. When the bridge is already built and suspenders have to be replaced for maintenance, a different problem has to be faced by the engineer, because the sequence of replacements and the values of the axial stresses depend very much on the service conditions of the bridge and on its historical evolution from construction to maintenance. Furthermore, the technique used for the original suspension system is fundamental in designing the replacement intervention. In this paper hanger replacement of tied-arch bridges with rigid bars is focused on, inspired by an actual case of a steel bridge of medium span in which replacement of the hangers for the entire suspension system was demanded by the high state of corrosion. This posed the problem of how to replace the hangers, which stressing sequence was the most suitable, together with evaluation of the choices made in the original design for the suspension system, which did not provide for the possibility of calibrating the state of tension through onsite adjustments of hanger prestress. Assessment of the stressing sequence for hanger replacement is presented and discussed and the results of the study performed in the actual case study are shown.
    publisherASCE
    titleStressing Sequence for Hanger Replacement of Tied-Arch Bridges with Rigid Bars
    typeJournal Paper
    journal volume27
    journal issue1
    journal titleJournal of Bridge Engineering
    identifier doi10.1061/(ASCE)BE.1943-5592.0001811
    journal fristpage04021099
    journal lastpage04021099-16
    page16
    treeJournal of Bridge Engineering:;2022:;Volume ( 027 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian