    Integrated Framework for Quantifying and Applying Nonworking Days to Planning and Scheduling for Determining Reasonable Construction Time

    Thumbnail
    View/Open
    (ASCE)ME.1943-5479.0001054.pdf (2.045Mb)
    Date
    2022-03-25
    Author
    Jongsik Yoon
    Kyungrai Kim
    Byungjoo Choi
    Metadata
    Show full item record
    Abstract
    Determining a reasonable construction time (RCT) is crucial in project planning and schedule management. Construction projects are exposed to the external environment, including rainfall, extreme temperatures, snowfall, and high wind speed, and the RCT should be evaluated considering these risks. The risks can be reflected by activity duration using nonworking days (NWDs). However, current construction planning and scheduling practices are ineffective for dealing with of NWD characteristics because working days (WDs) and NWDs are mixed in most schedule performance data used for schedule development. Activity durations estimated using historical performance data may not appropriately reflect the activity characteristics (work type, region, and work timing), leading to an unreasonable construction time for a project. Here, we propose an activity duration segmentation method (ADSM) for determining the RCT. The ADSM can evaluate the combined effects of weather factors according to work type and determine the operation rate, which depends on start date, work type, region, and activity duration. This leads to the separation of WDs and NWDs for determining the RCT. Case-based and comparative analyses were conducted to validate the proposed method. The mean absolute percentage error (MAPE), used to validate the ADSM, was 5.79%. The results of the present study show that NWDs can be determined by considering the characteristics of the various activities (e.g., sensitivities toward environmental conditions, start date) and the environmental conditions of the project (weather conditions at the project location, working hour patterns). The ADSM suggests an integrated framework for combining activity characteristics and project environmental conditions when determining NWDs of each activity. The ADSM can be used by project owners for determining the RCT or the contract time, which varies according to activity characteristics. Also, a construction scheduler can assess to what extent the construction schedule will be influenced by NWDs.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4281869
    Collections
    • Journal of Management in Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV