• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Short-Term Hydro Scheduling Considering Multiple Units Sharing a Common Tunnel and Crossing Vibration Zones Constraints

    Thumbnail
    View/Open
    %28ASCE%29WR.1943-5452.0001438.pdf (735.3Kb)
    Date
    10/1/2021
    Author
    Shengli Liao
    Zhanwei Liu
    Benxi Liu
    Xinyu Wu
    Chuntian Cheng
    Huaying Su
    Metadata
    Show full item record
    Abstract
    For low construction cost, the hydropower plant with multiple units sharing a common tunnel (HPMUST) has been widely used, which plays an essential role in the short-term scheduling of power systems worldwide. Thus, accurately solving short-term scheduling of HPMUST is important. Because water head loss of a tunnel is related to the discharge of multiple units, the existing methods noted in the literature tend to decompose this problem to find a near-optimal solution, instead of solving it integrally. With increasing requirements of short-term scheduling, this solution cannot meet practical operation requirements, and it becomes imperative to obtain high quality solutions by solving the original problem. For this purpose, this paper develops a mixed integer linear programming (MILP) model for short-term scheduling of HPMUST and proposes a gross water head-based iterative methodology to directly solve it. The MILP model takes account of not only head variations, common tunnel water head loss of multiple units, and water consumption during startup and shutdown of units, but also water consumption of crossing the vibration zone. Moreover, the paper proposes a novel generic linear programming formulation to model crossing the vibration zone, which can achieve a remarkable decline in number of times of crossing the vibration zone. The numerical results show that, compared with the average output model (AOM) and the real operation, the developed model and solution method can efficiently reduce water consumption of power generation within an acceptable time and meet practical operation requirements.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4272861
    Collections
    • Journal of Water Resources Planning and Management

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV