YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Short-Term Hydro Scheduling Considering Multiple Units Sharing a Common Tunnel and Crossing Vibration Zones Constraints

    Source: Journal of Water Resources Planning and Management:;2021:;Volume ( 147 ):;issue: 010::page 04021063-1
    Author:
    Shengli Liao
    ,
    Zhanwei Liu
    ,
    Benxi Liu
    ,
    Xinyu Wu
    ,
    Chuntian Cheng
    ,
    Huaying Su
    DOI: 10.1061/(ASCE)WR.1943-5452.0001438
    Publisher: ASCE
    Abstract: For low construction cost, the hydropower plant with multiple units sharing a common tunnel (HPMUST) has been widely used, which plays an essential role in the short-term scheduling of power systems worldwide. Thus, accurately solving short-term scheduling of HPMUST is important. Because water head loss of a tunnel is related to the discharge of multiple units, the existing methods noted in the literature tend to decompose this problem to find a near-optimal solution, instead of solving it integrally. With increasing requirements of short-term scheduling, this solution cannot meet practical operation requirements, and it becomes imperative to obtain high quality solutions by solving the original problem. For this purpose, this paper develops a mixed integer linear programming (MILP) model for short-term scheduling of HPMUST and proposes a gross water head-based iterative methodology to directly solve it. The MILP model takes account of not only head variations, common tunnel water head loss of multiple units, and water consumption during startup and shutdown of units, but also water consumption of crossing the vibration zone. Moreover, the paper proposes a novel generic linear programming formulation to model crossing the vibration zone, which can achieve a remarkable decline in number of times of crossing the vibration zone. The numerical results show that, compared with the average output model (AOM) and the real operation, the developed model and solution method can efficiently reduce water consumption of power generation within an acceptable time and meet practical operation requirements.
    • Download: (735.3Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Short-Term Hydro Scheduling Considering Multiple Units Sharing a Common Tunnel and Crossing Vibration Zones Constraints

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4272861
    Collections
    • Journal of Water Resources Planning and Management

    Show full item record

    contributor authorShengli Liao
    contributor authorZhanwei Liu
    contributor authorBenxi Liu
    contributor authorXinyu Wu
    contributor authorChuntian Cheng
    contributor authorHuaying Su
    date accessioned2022-02-01T22:13:18Z
    date available2022-02-01T22:13:18Z
    date issued10/1/2021
    identifier other%28ASCE%29WR.1943-5452.0001438.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4272861
    description abstractFor low construction cost, the hydropower plant with multiple units sharing a common tunnel (HPMUST) has been widely used, which plays an essential role in the short-term scheduling of power systems worldwide. Thus, accurately solving short-term scheduling of HPMUST is important. Because water head loss of a tunnel is related to the discharge of multiple units, the existing methods noted in the literature tend to decompose this problem to find a near-optimal solution, instead of solving it integrally. With increasing requirements of short-term scheduling, this solution cannot meet practical operation requirements, and it becomes imperative to obtain high quality solutions by solving the original problem. For this purpose, this paper develops a mixed integer linear programming (MILP) model for short-term scheduling of HPMUST and proposes a gross water head-based iterative methodology to directly solve it. The MILP model takes account of not only head variations, common tunnel water head loss of multiple units, and water consumption during startup and shutdown of units, but also water consumption of crossing the vibration zone. Moreover, the paper proposes a novel generic linear programming formulation to model crossing the vibration zone, which can achieve a remarkable decline in number of times of crossing the vibration zone. The numerical results show that, compared with the average output model (AOM) and the real operation, the developed model and solution method can efficiently reduce water consumption of power generation within an acceptable time and meet practical operation requirements.
    publisherASCE
    titleShort-Term Hydro Scheduling Considering Multiple Units Sharing a Common Tunnel and Crossing Vibration Zones Constraints
    typeJournal Paper
    journal volume147
    journal issue10
    journal titleJournal of Water Resources Planning and Management
    identifier doi10.1061/(ASCE)WR.1943-5452.0001438
    journal fristpage04021063-1
    journal lastpage04021063-11
    page11
    treeJournal of Water Resources Planning and Management:;2021:;Volume ( 147 ):;issue: 010
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian