Show simple item record

dc.contributor.authorJianjian Shen
dc.contributor.authorGuangze Chen
dc.contributor.authorChuntian Cheng
dc.contributor.authorWei Wei
dc.contributor.authorXiufei Zhang
dc.contributor.authorJun Zhang
dc.date.accessioned2022-02-01T22:13:06Z
dc.date.available2022-02-01T22:13:06Z
dc.date.issued9/1/2021
dc.identifier.other%28ASCE%29WR.1943-5452.0001424.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4272854
dc.description.abstractPeak shaving is a common challenge facing most provincial power grids (PPGs) in China. This paper presents an optimization model for the generation scheduling of multiple PPGs using peak-shaving indexes. Loads and power structures were considered to develop four indexes for quantifying the comprehensive peak-shaving needs of a PPG. The peak and off-peak capacity indexes, which represent the upward and downward balance pressures during hours of heavy and light loads, respectively, are functions of the dispatchable power, load extrema, and reserves. The rapid response index is defined to reflect the load-tracking pressure from off-peak to peak hours or vice versa. The fluctuation smoothing index represents the need for flexible regulation in response to frequent load changes in opposite directions. These indexes are normalized and integrated to establish a multiobjective model for peak operations in PPGs, subject to transmission energy and network limitations. This model is transformed into a solvable mixed-integer nonlinear programming model using polynomial and linear approximations and is solved with a branch-and-bound-based method. The model was implemented for the generation scheduling of the Xiluodu Hydropower Plant, which serves two PPGs. Case studies showed that the developed indexes provide accurate guidance for producing day-ahead generation schedules and distributing power among PPGs. The peak-shaving pressures are significantly alleviated in terms of index changes compared to an existing model.
dc.publisherASCE
dc.titleModeling of Generation Scheduling for Multiple Provincial Power Grids Using Peak-Shaving Indexes
dc.typeJournal Paper
dc.journal.volume147
dc.journal.issue9
dc.journal.titleJournal of Water Resources Planning and Management
dc.identifier.doi10.1061/(ASCE)WR.1943-5452.0001424
dc.journal.fristpage04021052-1
dc.journal.lastpage04021052-11
dc.page11
dc.treeJournal of Water Resources Planning and Management:;2021:;Volume ( 147 ):;issue: 009
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record