• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Modeling of Generation Scheduling for Multiple Provincial Power Grids Using Peak-Shaving Indexes

    Thumbnail
    View/Open
    %28ASCE%29WR.1943-5452.0001424.pdf (1.733Mb)
    Date
    9/1/2021
    Author
    Jianjian Shen
    Guangze Chen
    Chuntian Cheng
    Wei Wei
    Xiufei Zhang
    Jun Zhang
    Metadata
    Show full item record
    Abstract
    Peak shaving is a common challenge facing most provincial power grids (PPGs) in China. This paper presents an optimization model for the generation scheduling of multiple PPGs using peak-shaving indexes. Loads and power structures were considered to develop four indexes for quantifying the comprehensive peak-shaving needs of a PPG. The peak and off-peak capacity indexes, which represent the upward and downward balance pressures during hours of heavy and light loads, respectively, are functions of the dispatchable power, load extrema, and reserves. The rapid response index is defined to reflect the load-tracking pressure from off-peak to peak hours or vice versa. The fluctuation smoothing index represents the need for flexible regulation in response to frequent load changes in opposite directions. These indexes are normalized and integrated to establish a multiobjective model for peak operations in PPGs, subject to transmission energy and network limitations. This model is transformed into a solvable mixed-integer nonlinear programming model using polynomial and linear approximations and is solved with a branch-and-bound-based method. The model was implemented for the generation scheduling of the Xiluodu Hydropower Plant, which serves two PPGs. Case studies showed that the developed indexes provide accurate guidance for producing day-ahead generation schedules and distributing power among PPGs. The peak-shaving pressures are significantly alleviated in terms of index changes compared to an existing model.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4272854
    Collections
    • Journal of Water Resources Planning and Management

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV