• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Decision-Aid Frameworks for Earned Value Measurement or Assessment by the Construction Contract Engineer

    Thumbnail
    View/Open
    %28ASCE%29LA.1943-4170.0000481.pdf (4.636Mb)
    Date
    8/1/2021
    Author
    Farah Demachkieh
    Mohamed-Asem Abdul-Malak
    Metadata
    Show full item record
    Abstract
    Construction project controls is a process that is concerned with attempting to complete the contracted works within the allocated time frame and the preagreed budget, all in accordance with the set quality standards. To this end, the earned value management (EVM) method is recognized as a well-established technique offering an integrated approach for the efficient monitoring and controlling of the project’s cost and schedule targets during the course of execution. That said, this research aimed at investigating several decision-aid frameworks that can systematically guide the construction contract engineer in making the EVM tool better accustomed and suited for exercising project control and administrating construction contracts, while making use of and benefiting from the enhanced capabilities of the technique that are widely spread in the archived literature. To this effect, the adopted multistep methodology included (1) the verification of the degree of importance of project controls in relation to project success, (2) the classification of the shortcomings reported to be encumbering EVM’s employability as a project controls tool, and (3) the compilation and synthesis of the encountered improvements. The main research outcomes further involved developing several EVM-based frameworks, which shall be of value to the engineer, through stipulating an integrated set of methods and metrics used for (1) checking the analytical schedule-based S-curve submitted by the contractor, (2) dealing with interim payment valuations and certifications, and (3) forecasting and updating the remaining duration for the construction project on hand. Finally, the related requirements to be met by contractors and the types of authority to be entrusted with the engineer are summarized for facilitating the employability of the proposed frameworks, thereby potentially minimizing the likelihood of conflicts and disputes to arise between owners and contractors on construction projects.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4269794
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV