Show simple item record

dc.contributor.authorAmelia Celoza
dc.contributor.authorFernanda Leite
dc.contributor.authorDaniel P. de Oliveira
dc.date.accessioned2022-01-31T23:28:36Z
dc.date.available2022-01-31T23:28:36Z
dc.date.issued8/1/2021
dc.identifier.other%28ASCE%29LA.1943-4170.0000478.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4269790
dc.description.abstractBuilding information modeling (BIM) implementation is growing in the architecture, engineering, and construction (AEC) industry; however, there is little insight on how contract practices can impact BIM implementation and subsequent project performance. The objective of this research was to evaluate the impact of BIM-related contract practices on project performance. Researchers surveyed the industry on BIM practices, including current contract practices, stakeholders’ uses, and the use of BIM execution plans (BEPs). Qualitative comparative analysis was employed to systematically compare cases and identify necessary and sufficient conditions associated with cost success. Researchers found that contractors and subcontractors being contractually required to use BIM and the use of BEP on a project were associated with positive project cost outcomes.
dc.publisherASCE
dc.titleImpact of BIM-Related Contract Factors on Project Performance
dc.typeJournal Paper
dc.journal.volume13
dc.journal.issue3
dc.journal.titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
dc.identifier.doi10.1061/(ASCE)LA.1943-4170.0000478
dc.journal.fristpage04521011-1
dc.journal.lastpage04521011-8
dc.page8
dc.treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2021:;Volume ( 013 ):;issue: 003
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record