• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Grasping the Nonconformities in Building Construction Supply Chains

    Thumbnail
    View/Open
    (ASCE)CF.1943-5509.0001546.pdf (291.9Kb)
    Date
    2/1/2021
    Author
    Muhammad Saiful Islam
    Md Maksudul Islam
    Habibur R. T. Imran
    Martin Skitmore
    Madhav P. Nepal
    Metadata
    Show full item record
    Abstract
    Identifying and understanding potential nonconformities in different construction phases is key to ensuring the anticipated quality and performance of a building in its service period. Previous studies mostly focus on studying nonconformities in the handover or posthandover phases of building projects. There has been relatively less attention paid to the issue in the preconstruction and construction phases of building projects, particularly in densely populated South Asian countries. This study aims to identify the potential and critical nonconformity problems from the initiation to construction phases of building projects, with a particular focus on Bangladesh, where the quality and integrity of building construction works and practices are generally lacking. The study is informed by a comprehensive literature review of the topic, followed by a series of discussions and workshops with highly qualified and experienced experts to identify the potential nonconformities frequently encountered in building construction projects. Additionally, three building projects are studied to identify the instances of nonconformities and their root causes. The major nonconformities identified from this study are improper soil investigation, poor quality of materials, poor quality of concrete, improper alignment of structural members, insufficient concrete cover, lack of or no curing of concrete, defective formwork, and early removal of formwork. Subsequently, specific remedial actions are recommended for the individuals/organizations involved throughout the building construction phases in developing countries, such as Bangladesh, toward improving the quality and performance of buildings in their service lives.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4269673
    Collections
    • Journal of Performance of Constructed Facilities

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV