Show simple item record

dc.contributor.authorKunhee Choi
dc.contributor.authorYangtian Yin
dc.contributor.authorDarlene Goehl
dc.contributor.authorH. David Jeong
dc.date.accessioned2022-01-30T22:39:53Z
dc.date.available2022-01-30T22:39:53Z
dc.date.issued1/1/2021
dc.identifier.other(ASCE)ME.1943-5479.0000863.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4269375
dc.description.abstractAlthough the use of alternative contracting methods (ACMs) has become increasingly common, little is known about their effects on a project’s time-cost-change performance. This study draws from 2,572 project datapoints, addressing this research gap by plotting, analyzing, and validating high confidence performance indicators. The effects of different ACMs on project time, cost, and change performance were all evaluated and time-cost performance prediction models developed and tested. The results reveal that the use of incentives/disincentives is preferable for reducing the duration of a project. Lump-sum contracting is an effective choice for onbudget project delivery, while cost-plus-time bidding is significantly less effective than incentives/disincentives and no-excuse bonus contracting. Notably, the results also convey that ACMs with large project sizes are more prone to schedule delays and cost overruns. The robustness of the predictive models was verified by a predicted error sum of squares validation. The findings of this study will help state transportation agencies make better-informed decisions by providing foresight regarding the pros and cons of ACMs for aspects of project time-cost-change performance. The use of the predictive models will also assist agencies in justifying the probable time-cost impact of project change orders, enabling them to conduct more reliable risk assessments and develop more realistic contingency plans in the project scoping phase.
dc.publisherASCE
dc.titleAlternative Contracting Methods: Modeling and Assessing the Effects of Contract Type on Time-Cost-Change Performance
dc.typeJournal Paper
dc.journal.volume37
dc.journal.issue1
dc.journal.titleJournal of Management in Engineering
dc.identifier.doi10.1061/(ASCE)ME.1943-5479.0000863
dc.journal.fristpage04020096
dc.journal.lastpage04020096-14
dc.page14
dc.treeJournal of Management in Engineering:;2021:;Volume ( 037 ):;issue: 001
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record