    Alternative Contracting Methods: Modeling and Assessing the Effects of Contract Type on Time-Cost-Change Performance

    Thumbnail
    View/Open
    (ASCE)ME.1943-5479.0000863.pdf (1.641Mb)
    Date
    1/1/2021
    Author
    Kunhee Choi
    Yangtian Yin
    Darlene Goehl
    H. David Jeong
    Metadata
    Show full item record
    Abstract
    Although the use of alternative contracting methods (ACMs) has become increasingly common, little is known about their effects on a project’s time-cost-change performance. This study draws from 2,572 project datapoints, addressing this research gap by plotting, analyzing, and validating high confidence performance indicators. The effects of different ACMs on project time, cost, and change performance were all evaluated and time-cost performance prediction models developed and tested. The results reveal that the use of incentives/disincentives is preferable for reducing the duration of a project. Lump-sum contracting is an effective choice for onbudget project delivery, while cost-plus-time bidding is significantly less effective than incentives/disincentives and no-excuse bonus contracting. Notably, the results also convey that ACMs with large project sizes are more prone to schedule delays and cost overruns. The robustness of the predictive models was verified by a predicted error sum of squares validation. The findings of this study will help state transportation agencies make better-informed decisions by providing foresight regarding the pros and cons of ACMs for aspects of project time-cost-change performance. The use of the predictive models will also assist agencies in justifying the probable time-cost impact of project change orders, enabling them to conduct more reliable risk assessments and develop more realistic contingency plans in the project scoping phase.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4269375
    Collections
    • Journal of Management in Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV