    Exploring the Causes of Delays in Construction Industry Using a Cause-and-Effect Diagram: Case Study for Iran

    Thumbnail
    View/Open
    %28ASCE%29AE.1943-5568.0000431.pdf (1.417Mb)
    Date
    9/1/2020 1
    Author
    Omid Abbasi
    Esmatullah Noorzai
    Kobra Gharouni Jafari
    Mahmood Golabchi
    Metadata
    Show full item record
    Abstract
    Delays in achieving projects' objectives according to the planned schedule are considered one of the main sources of conflicts in Iran's construction industry. A precise and structured methodology and baseline to properly evaluate the root causes of delays and present guidelines has not been established, to the best of the authors’ knowledge. Therefore, there are limited perspectives on the effects of delays on the projects, creating an inefficient approach to deal with construction delays. The purpose of this study is to identify the most significant causes of construction delays, categorize and rank them to determine the root of delays, and provide a suitable solution. After extracting the main causes of delays through a comprehensive literature review and interviews, a structured questionnaire was designed to rank the delays in terms of three indices of importance, occurrence probability, and impact. In addition, when the causes of delays were identified and classified, the causes were split into eight main groups including the contractor, owner, design, procurement, equipment, consultant, labor, and miscellaneous, and the results were depicted using a cause-and-effect diagram. The findings show that the fundamental group causing delays was the contractor category, and the most critical cause was the contractor's financial problems. The primary conclusion of this study is that financial matters play a critical role in project delays in Iran's construction industry, and it is recommended that owners should take more meticulous measures to choose the most qualified contractor with strong financial backgrounds and they need to define and phase the project to their financial resources and determine an efficient financial plan for payments.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4268242
    Collections
    • Journal of Architectural Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV