YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Architectural Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Architectural Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Exploring the Causes of Delays in Construction Industry Using a Cause-and-Effect Diagram: Case Study for Iran

    Source: Journal of Architectural Engineering:;2020:;Volume ( 026 ):;issue: 003
    Author:
    Omid Abbasi
    ,
    Esmatullah Noorzai
    ,
    Kobra Gharouni Jafari
    ,
    Mahmood Golabchi
    DOI: 10.1061/(ASCE)AE.1943-5568.0000431
    Publisher: ASCE
    Abstract: Delays in achieving projects' objectives according to the planned schedule are considered one of the main sources of conflicts in Iran's construction industry. A precise and structured methodology and baseline to properly evaluate the root causes of delays and present guidelines has not been established, to the best of the authors’ knowledge. Therefore, there are limited perspectives on the effects of delays on the projects, creating an inefficient approach to deal with construction delays. The purpose of this study is to identify the most significant causes of construction delays, categorize and rank them to determine the root of delays, and provide a suitable solution. After extracting the main causes of delays through a comprehensive literature review and interviews, a structured questionnaire was designed to rank the delays in terms of three indices of importance, occurrence probability, and impact. In addition, when the causes of delays were identified and classified, the causes were split into eight main groups including the contractor, owner, design, procurement, equipment, consultant, labor, and miscellaneous, and the results were depicted using a cause-and-effect diagram. The findings show that the fundamental group causing delays was the contractor category, and the most critical cause was the contractor's financial problems. The primary conclusion of this study is that financial matters play a critical role in project delays in Iran's construction industry, and it is recommended that owners should take more meticulous measures to choose the most qualified contractor with strong financial backgrounds and they need to define and phase the project to their financial resources and determine an efficient financial plan for payments.
    • Download: (1.417Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Exploring the Causes of Delays in Construction Industry Using a Cause-and-Effect Diagram: Case Study for Iran

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4268242
    Collections
    • Journal of Architectural Engineering

    Show full item record

    contributor authorOmid Abbasi
    contributor authorEsmatullah Noorzai
    contributor authorKobra Gharouni Jafari
    contributor authorMahmood Golabchi
    date accessioned2022-01-30T21:27:46Z
    date available2022-01-30T21:27:46Z
    date issued9/1/2020 12:00:00 AM
    identifier other%28ASCE%29AE.1943-5568.0000431.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4268242
    description abstractDelays in achieving projects' objectives according to the planned schedule are considered one of the main sources of conflicts in Iran's construction industry. A precise and structured methodology and baseline to properly evaluate the root causes of delays and present guidelines has not been established, to the best of the authors’ knowledge. Therefore, there are limited perspectives on the effects of delays on the projects, creating an inefficient approach to deal with construction delays. The purpose of this study is to identify the most significant causes of construction delays, categorize and rank them to determine the root of delays, and provide a suitable solution. After extracting the main causes of delays through a comprehensive literature review and interviews, a structured questionnaire was designed to rank the delays in terms of three indices of importance, occurrence probability, and impact. In addition, when the causes of delays were identified and classified, the causes were split into eight main groups including the contractor, owner, design, procurement, equipment, consultant, labor, and miscellaneous, and the results were depicted using a cause-and-effect diagram. The findings show that the fundamental group causing delays was the contractor category, and the most critical cause was the contractor's financial problems. The primary conclusion of this study is that financial matters play a critical role in project delays in Iran's construction industry, and it is recommended that owners should take more meticulous measures to choose the most qualified contractor with strong financial backgrounds and they need to define and phase the project to their financial resources and determine an efficient financial plan for payments.
    publisherASCE
    titleExploring the Causes of Delays in Construction Industry Using a Cause-and-Effect Diagram: Case Study for Iran
    typeJournal Paper
    journal volume26
    journal issue3
    journal titleJournal of Architectural Engineering
    identifier doi10.1061/(ASCE)AE.1943-5568.0000431
    page16
    treeJournal of Architectural Engineering:;2020:;Volume ( 026 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian