Show simple item record

dc.contributor.authorBing-hui Fan
dc.contributor.authorSu-guo Wang
dc.contributor.authorBao-chun Chen
dc.date.accessioned2022-01-30T21:27:13Z
dc.date.available2022-01-30T21:27:13Z
dc.date.issued10/1/2020 12:00:00 AM
dc.identifier.other%28ASCE%29CF.1943-5509.0001492.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4268224
dc.description.abstractTie bars on through tied arch bridges are often in poor condition and may serve as an external cause of a tie-bar failure accident; nevertheless, bridge structural robustness contributes greatly in resisting progressive collapse, and poor robustness tends to be the essential internal cause of possible accident. To study the dynamic effect of tie-bar failure of a through tied arch bridge and to reveal the mechanism of how structural robustness reduces dynamic effects, a finite-element model of a typical rigid-frame through tied arch bridge is developed based on the most adverse tie-bar breaking time, a transient-unloading method with equivalent load is adopted to analyze the dynamic response of tie-bar failure, and the results under different working conditions are compared. Furthermore, parameter analysis of the arch-to-pier stiffness ratio is conducted for the dynamic-amplification effect. The results indicate that both the pier and the arch rib have significant dynamic-amplification effects with respect to tie-bar breakage, and the remaining tie bars are the most vulnerable elements of the bridge; thus, they should be considered the most important elements when conducting tie-bar failure analysis; the most adverse breaking time adopted in cable breakage analysis can be taken as 0.01  T; a greater arch-to-pier stiffness ratio is beneficial to reduce the dynamic response brought on by tie-bar breakage; therefore, a rigid-frame through tied arch bridge should be designed with a large pier thrust stiffness, while a simply supported tied arch bridge should not be used in future through arch bridges, and existing ones should be retrofitted as soon as possible.
dc.publisherASCE
dc.titleDynamic Effect of Tie-Bar Failure on Through Tied Arch Bridge
dc.typeJournal Paper
dc.journal.volume34
dc.journal.issue5
dc.journal.titleJournal of Performance of Constructed Facilities
dc.identifier.doi10.1061/(ASCE)CF.1943-5509.0001492
dc.page12
dc.treeJournal of Performance of Constructed Facilities:;2020:;Volume ( 034 ):;issue: 005
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record