• Login
    View Item 
    •   DSpace Home
    • ASCE
    • ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    The Effect of Parameter Uncertainty on Hydropower Asset Replacement Cost Models

    Thumbnail
    View/Open
    AJRUA6.0001068.pdf (536.7Kb)
    Date
    9/1/2020 1
    Author
    Stephen Signore
    Boualem Hadjerioua
    Metadata
    Show full item record
    Abstract
    Hydropower asset managers use whole-life cost models to better manage risk costs and asset replacement strategies for their hydroelectric powertrain and balance of plant assets. Whole-life cost models can be simplified to four main input variables: Weibull scale (α) and shape (β) parameters that inform the probability of failure; a planning horizon δ, indicating the frequency of the decision-making opportunity; and a cost ratio (CR) that compares unplanned outage costs with planned outage costs. Both the probability of failure models and the cost estimates suffer from high uncertainty and a lack of information regarding confidence bounds. The sensitivity of model results to the uncertainty inherent in the CRs is highly important for informing facility and fleet-wide decision making. Weibull shape and scale parameters were modeled at ±10% errors for a wide range of CRs. This sensitivity study reveals that (1) a ±10% error in the shape parameter imparts a 0.04% to 5.89% change in the optimized annualized cost (OC) over the range of CRs; (2) at CRs above 1.4, the 4-year (±10%) error in the scale parameter causes a change in optimal point (OP) of replacement of 2 to 4 years; and (3) as CRs increase, the impact of errors on OP first measured as 7 years decreases to less than 1 year by the time CRs reach 2.4.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4267988
    Collections
    • ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV