• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Energy Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Energy Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Advanced Exergoeconomic Evaluation of Large-Scale Coal-Fired Power Plant

    Thumbnail
    View/Open
    %28ASCE%29EY.1943-7897.0000633.pdf (529.6Kb)
    Date
    2020
    Author
    Ligang Wang
    Peng Fu
    Zhiping Yang
    Tzu-En Lin
    Yongping Yang
    George Tsatsaronis
    Metadata
    Show full item record
    Abstract
    Conventional exergy-based analysis can only identify the location and magnitude of thermodynamic inefficiencies (exergy destruction), while an advanced analysis can further reveal their source and avoidability by splitting each inefficiency into endogenous/exogenous and avoidable/unavoidable parts and their combinations. In this paper, a framework and implementation for a comprehensive evaluation of energy systems via conventional and advanced exergoeconomic analyses are summarized and performed to a state-of-the-art pulverized-coal power plant. An easy-to-implement procedure was proposed to calculate the endogenous exergy destruction. Different from the previous analyses of such plants, the boiler subsystem of the considered plant is simulated in detail with coal combustor and a series of (radiation- or convection-dominating) heat surfaces. The exergoeconomic performances (exergy dissipation as well as the related costs) of each component and the whole system are evaluated first. Then, the splitting of all exergy destructions and costs is performed for the insights of their sources and avoidability to suggest improvement measures. The results show that large parts of the exergy destructions within most of the components are endogenous; particularly, over half of the avoidable thermodynamic inefficiencies within most of the components are endogenous with the share of the avoidable part varying significantly among different components. Most costs related to either investment or exergy destruction are endogenous, and only nearly 10% of the costs of the whole system could be avoided for such a modern power plant. Moving convection-dominating heating surfaces into the furnace and increasing air-preheating temperature are suggested for performance enhancement.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4265534
    Collections
    • Journal of Energy Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV